fairlife Production & Distribution Facility | 探花精选

探花精选

We use cookies to enhance your experience, analyze site usage, and support our marketing efforts. By clicking 'Accept All,' you agree to the storing of cookies on your device. You can customize your preferences or opt out of non-essential cookies at any time.

Preferences
Projects

fairlife Production and Distribution Facility

Location
Goodyear, Arizona
Project Size
300,000 SF
Completion Year
2021
Fairlife Dairy Distribution Design Build 探花精选 1
Fairlife Processing Design Build 探花精选 Processing
Fairlife Distribution Design Build 探花精选 10
Fairlife Processing Design Build 探花精选 Warehouse 2
Fairlife Processing Design Build 探花精选 Processing 5
Fairlife Distribution Design Build 探花精选 11
Fairlife Plant Design Build 探花精选 Exterior Sign Night
Fairlife Processing Design Build 探花精选 Processing 2
Fairlife Processing Design Build 探花精选 Processing 4
Fairlife Distribution Design Build 探花精选 4
Fairlife Distribution Design Build 探花精选 8
Fairlife Distribution Design Build 探花精选 7
Fairlife Distribution Design Build 探花精选 9
Fairlife Processing Design Build 探花精选 Processing 3
Fairlife Dairy Distribution Design Build 探花精选 5
Fairlife Processing Design Build 探花精选 Warehouse
Fairlife Distribution Design Build 探花精选 6
Fairlife Plant Design Build 探花精选 Exterior
Fairlife Plant Design Build 探花精选 Exterior Sign
Fairlife Plant Design Build 探花精选 Exterior Front Day

The objective of this project was to design and construct a state-of-the-art production and distribution facility. The facility aimed to enhance the production capacity of all fairlife products by incorporating cutting-edge manufacturing technologies and energy-efficient equipment, ultimately reducing power consumption. We undertook various tasks for this project, including site development, building design, engineering, and construction, as well as the installation of all utilities. The project showcased a combination of construction elements such as concrete tilt-up, colored IMP (insulated metal panel) panels, and split-face CMU (concrete masonry unit) for both exterior walls and screening walls. The structural steel incorporated a mix of pre-engineered and conventional steel, along with skylights featuring LED lighting to illuminate the building. The flooring consisted of conventional concrete slabs adorned with dairy brick tiles and protected by polyurethane coatings. The facility was fully conditioned and included refrigerated spaces for both coolers and freezers.